Component sourcing and production setup that holds every factory to your spec
For hardware founders with a working prototype and no manufacturing team. We choose a supplier for every part on your BOM, set up the tooling and assembly, and hold each factory to your drawings. The result: parts that fit, a first batch that matches the sample and units that ship on the date you promised. Anyone can find a factory. The hard part is making sure it builds exactly what you drew.
Your spec is only as good as the check behind it
To you, "316 stainless, ±0.05 mm" is a requirement. A factory that runs on speed and standard tooling reads it as a starting point. It might use 304 on one batch or loosen a tolerance to fit an existing die. You won't see this in the quote. You'll see it mid-production, one part at a time, until the assembly doesn't fit.
Drift is quiet at first. Your backers notice it anyway.
More suppliers mean more places for your spec to drift.
An online supplier may be a trading company that passes your drawings on to a factory you never see.
If a problem turns up after tooling is paid for, it can cost you your delivery date.
How we keep every part to spec
- 01
Engineering review before the quote
We go through your drawings and mark which tolerances, materials and finishes can't change, and why. The factory quotes on your real requirements, so you don't find the gaps later.
- 02
Custom or off-the-shelf, line by line
We make a part custom only when it's worth the tooling cost. If a standard component does the job, we use it. You pay for fewer tools and have fewer places for drift.
- 03
A real factory behind every part
Before a factory gets your files, we audit it on site. You know who is actually making your part, not a trading company in between.
- 04
People on the factory floor
Our bilingual delivery managers in Ningbo visit factories in person. They check parts against the approved sample during production, not only when the boxes are packed.
- 05
Tooling made for your part
We manage the molds, dies and fixtures, each built to your part rather than adapted from a factory's standard range. Your first samples come off tools made for them.
Built by specialists in China. Shipped to you.
1M+ products shippedIn Asia since 2006Offices in Stockholm, Ningbo and Seattle
Three stages. You decide at the end of each one.
Your files are covered by an NDA from day one, with a contract through our entity in Sweden, the US or China.
1. Plan and quote
We review your BOM, choose a supplier for each part and give you a per-unit cost and lead time you can show investors. The schedule works back from your launch date and allows for Chinese New Year and Golden Week. Then you decide whether to go ahead.
2. Tooling and samples
We build the tools and make first samples. We check them against your drawings before you see them. Then you approve the sample, ask for changes or stop.
3. Production and delivery
We check the first batch against the approved sample, then handle assembly, in-process QC, protective packaging and freight. Warehousing and fulfilment are available if you need them.
148 components. 72 suppliers. 6 countries. One contact.
A client needed a complete assembly line built from scratch for a complex multi-component product. We sourced, vetted and managed all 72 suppliers across six countries, and the product was delivered on time. The client dealt with one point of contact the whole way.
Prototype to 5,000 units shipped: 200+ components, 18 suppliers, assembly line set up, QC and logistics managed.
Cooling systems: better a leak in our pressure test than in a backer's hands. Thermal, electronic and housing parts sourced, performance tested, certification supported.
Crowdfunded launches shipped on time through our Fast-Track programme.

Copied designs, drifting specs, missed dates: read before sending drawings
Component sourcing and production setup means choosing a supplier for every part on your BOM, making the tooling, and building the assembly and QC process that turns those parts into a finished product. At Sourcing Allies it runs from drawing review to delivery. One team manages every supplier, and our delivery managers in Ningbo check parts on the factory floor.
Choose off-the-shelf wherever a standard part meets your spec, and custom only where the part sets your product apart or no standard part fits. Every custom part needs tooling, a sample round and its own supplier to manage. We go through your BOM line by line and explain the reason behind each decision before you pay for any tooling.
BOM sourcing in China means matching each part to a factory that specialises in that process, whether that's injection moulding, stamping, die casting or extrusion. Then every supplier has to be coordinated to one schedule. In one project we managed 148 components from 72 suppliers across six countries, and the client had one point of contact.
Spec drift stops when someone checks parts against the approved sample during production, not only at the end. We mark non-negotiable tolerances and materials before quoting and audit each factory's process control. Our bilingual delivery managers in Ningbo visit factories in person during multi-component sourcing in China. Problems get caught at the part, before they reach the assembly line.
We sign an NDA on every project and contract through our legal entities in Sweden, the US and China, so you have recourse in a jurisdiction you can use. We also check that each supplier is the real manufacturer and not a trading company, so you know exactly who has your files.
We have shipped Kickstarter and Indiegogo projects on time. Our Fast-Track programme is built for crowdfunded and investor-backed launches. We plan backwards from your date, including Chinese New Year and Golden Week, and tell you at the planning stage if the date isn't realistic. You find out then, not after tooling.
Usually not. If you only need one standard or commodity part, a sourcing partner adds cost without much benefit, and we'll tell you that. Our work makes sense when your product has many parts, several processes and suppliers who all have to deliver to one assembly date.
Yes. Component sourcing and production setup is often the first stage of a full turnkey build. We also offer contract manufacturing, OEM/ODM production, warehousing and global fulfilment across our network in China, Vietnam and India. See our contract manufacturing page for how those services work.
Bring your BOM. We'll show you where it's likely to drift.
In the meeting we go through your prototype and BOM with you. You leave knowing which parts should be custom, which should be off-the-shelf, and where your spec is most likely to change at the factory.
A drawing, a sketch or a paragraph is enough to start.