The product manufacturing process, with a go/no-go gate at every step

Our product manufacturing process takes your working prototype to thousands of identical units in three gated stages: engineering review, sample approval and a limited first production batch. For hardware founders with a prototype, funding and a promised ship date, but no manufacturing team. At each gate you decide go or no-go before the next round of investor money goes out. That way you never pay for tooling on a design that can't be built.

Looking finished isn't the same as being manufacturable

A prototype proves it works once. Production has to prove it works 5,000 times. To get there, tolerances, wall thicknesses, materials and the bill of materials have to read the same way at every supplier. In our experience, first-time founders often find this gap only after the tooling has been paid for.

  1. 01

    Tooling paid for twice

    If the drawings weren't production-ready, the moulds and dies have to be cut again. You lose the money, plus weeks you already promised your backers.

  2. 02

    Specs that get lost in translation

    The hard part isn't the language. It's making sure your drawing and the factory owner's priorities describe the same product.

  3. 03

    Committing before you know

    The worst outcome is spending months and a funding round, then finding out it won't work. Gates catch that early.

Three gates from prototype to mass production

Retooling because the drawings weren't ready is an expensive way to learn. That's why the ten steps are grouped into three gates, and you approve each gate before any money moves to the next.

If you want one partner to run all three gates, see turnkey manufacturing. If you only need a factory found, see sourcing.

  1. Your prototype checked for how the factory will make it, before tooling: moulded, cast, forged, stamped or extruded.

  2. Itemised quote covering production, assembly, packaging and freight.

  3. Factory audits done in person from Ningbo: staff size, machines, working conditions, worker safety, process control and management structure.

  4. Schedule planned backward from your launch date, including Chinese New Year and Golden Week.

What we make

Built by specialists in China. Shipped to you.

1M+ products shippedIn Asia since 2006Offices in Stockholm, Ningbo and Seattle

The gates hold up on complex builds

148 components, 72 suppliers, 6 countries. We built a full assembly line from scratch and delivered it on time, with one point of contact.

Prototype to 5,000 units shipped: more than 200 components from 18 suppliers. We set up the assembly line and managed QC and logistics.

Crowdfunded launches delivered to backers on time. Our Fast-Track programme covers crowdfunded and investor-backed launches.

Hands over a drawing on a workbench

What founders ask before cutting tooling

Your backers have a delivery date. Settle these before tooling starts.

  1. What are the steps in the product manufacturing process?

    Our product manufacturing process has ten steps grouped into three go/no-go gates. Gate 1, engineering review: drawing review, sourcing and quoting. Gate 2, sample approval: tooling, component samples and testing of assembled pre-production units. Gate 3, first production batch: a limited run, then full-scale production, logistics and fulfilment. Later changes, such as new variants or finishes, go through the same gates.

  2. What is a manufacturability review?

    A manufacturability review checks whether a design can be built the same way at volume, not whether it looks right. We review your CAD files and specifications, flag missing or unclear details and recommend materials, processes and finishes, such as injection moulding, die casting, metal stamping or aluminium extrusion. It happens before tooling, when problems cost the least to fix.

  3. What is a go/no-go gate in manufacturing?

    A go/no-go gate is a checkpoint where you decide whether the project moves on to the next stage. We use three: after the engineering review and quote, after sample approval, and after the first production batch. At each gate you have a real cost, a physical sample or finished units to judge before you spend more.

  4. What is a pre-production validation process?

    Pre-production validation proves the product and the tooling before mass production starts. We make the tooling and check each component sample. Then we assemble complete units under near-production conditions and test them for function, durability and fit to spec. You approve the sample, and the first production batch is checked against it.

  5. How long does it take to go from prototype to mass production?

    It depends on how ready your drawings are, how many parts need custom tooling and how many suppliers are involved. You get a real lead time at Gate 1, before you commit to tooling. We plan backward from your launch date and allow for Chinese New Year and Golden Week, which can take weeks out of a schedule.

  6. How do I protect my design when I send files to a factory?

    Sourcing Allies signs an NDA on every project and contracts through legal entities in Sweden, the US and China, so you have legal recourse in more than one jurisdiction. Our bilingual delivery managers based in Ningbo visit the factories in person, so you know exactly who is making your product.

  7. How do I know a supplier is a real factory and not a trading company?

    You confirm it on site. Our delivery managers in Ningbo audit factories in person. The audits cover staff size, machines, working conditions, worker safety, social responsibility, process control and management structure. The visit also shows whether the supplier's certificates belong to the plant that will actually build your product.

  8. Is manufacturing in China always cheaper?

    No. The lowest bid is rarely the right reason to pick a factory. What China and Vietnam offer is a complete, coordinated supply chain for products with many components and suppliers. If your product is a single simple part, you may not need a sourcing partner at all, and we'll tell you so.

Next step

Bring your prototype. Leave with a plan, gate by gate.

Tell us about your prototype, your target volume and the date you've promised. We'll tell you which gate you're at, what it takes to pass and what it will cost to find out. If you don't need us, we'll say so.